PINION ROAD over DRAINAGE DITCH
SEC 36 T26N R 1W · County 119, Mississippi · Built 2011 · 2 Lanes · 20 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.087831, -90.244386
This bridge is in worse condition than 30.5% of bridges in County 119. The average bridge in Mississippi is 0 years old; this one is 15 years old.
Nearby Bridges
MILAM LANE over DITCH
Built 1990
LONG ROAD over CREEK
Built 1970
VANCE ROAD over OPOSSUM BAYOU
Built 1970
GOVERNMENT ROAD over TRIB OF LONG BAYOU
Built 1972
SHINE-TURNER RD over TALAHATCHIE RIVER
Built 1980
MELTON ROAD over TRIB OF MUDDY BAYOU
Built 2008
MELTON ROAD over MUDDY BAYOU
Built 1971
PUGH ROAD over STOVALL BAYOU
Built 2017
VANCE ROAD over CASSIDY BAYOU
Built 1970
MELTON ROAD over BRUSHY BAYOU
Built 1982
Bridge Details
- Structure #
- SA6000000000097
- Year Built
- 2011
- Length
- 28.2 m (92.5 ft)
- Max Span
- 9.4 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $6,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.