BLAZO ROAD over LARGE DRAIN
SEC 29 T 1N R 9E · County 113, Mississippi · Built 2017 · 2 Lanes · 55 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
31.018583, -90.323306
This bridge is in worse condition than 85.3% of bridges in County 113. The average bridge in Mississippi is 0 years old; this one is 9 years old.
Nearby Bridges
SILVER DRIVE over LARGE DRAIN
Built 1999
Martin Rd over SNELL BRANCH
Built 2011
SMITHBURG ROAD over SILVER SPRINGS CREEK
Built 2004
LA0450 over SNELL BRANCH
Built 1957
SILVER DRIVE over SILVER SPRINGS CREEK
Built 1999
JOE TUCKER ROAD over SILVER SPRINGS CREEK
Built 1993
MT. HERMAN ROAD over SILVER SPRINGS CREEK
Built 2007
SR 575 over CREEK
Built 2017
SR 575 over CREEK
Built 2017
EMERALD-STATELINE over SMALL DRAIN
Built 2007
Bridge Details
- Structure #
- SA570000000A051
- Year Built
- 2017
- Length
- 16.9 m (55.4 ft)
- Max Span
- 5.7 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 55
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $212,000
- Total Project Cost
- $382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.