HWY. 570 NORTH EXT over WEST TOPISAW CREEK

SEC 17 T 4N R 9E B · County 113, Mississippi · Built 1972 · 2 Lanes · 850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
SA5700000000176
Year Built
1972
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$901,000
Total Project Cost
$1,622,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.