PRAIRIE POINT RD over DITCH

SEC 18 T15N R19E B · County 103, Mississippi · Built 1966 · 2 Lanes · 670 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
SA5200000000103
Year Built
1966
Length
7.3 m (24 ft)
Max Span
3.7 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
670
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.