SPELL DRIVE over CREEK

SEC 10 T 3N R18W · County 091, Mississippi · Built 1988 · 2 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
7
Good
Superstructure
7
Good
Substructure
2
Critical

Bridge Details

Structure #
SA4600000000081
Year Built
1988
Length
21 m (68.9 ft)
Max Span
9.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$86,000
Total Project Cost
$124,000