LEE DR over TRIB TO SAW DUST BRANCH

SEC 14 T 5N R 7E · County 085, Mississippi · Built 1930 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
SA4300000000305
Year Built
1930
Length
23.8 m (78.1 ft)
Max Span
7.9 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$139,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.