PRIMITIVE DR SE over TRIBUTARY TOPISAW CREEK

SEC 23 T 5N R 9E B · County 085, Mississippi · Built 1998 · 2 Lanes · 135 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA4300000000072
Year Built
1998
Length
9.4 m (30.8 ft)
Max Span
9.4 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
135
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$13,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.