RABBIT ROAD over HOOKER HOLLOW CREEK
SEC 14 T 7N R20W B · County 077, Mississippi · Built 1984 · 2 Lanes · 70 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.579908, -89.989886
This bridge is in worse condition than 82.7% of bridges in County 077. The average bridge in Mississippi is 0 years old; this one is 42 years old.
Nearby Bridges
MS HWY NO43 over BRANCH
Built 2011
N. SHADY GROVE RD over HOOKER HOLLOW CREEK
Built 2001
US 84 over SILVER CREEK
Built 2007
US 84 over SILVER CREEK
Built 2007
SR 184 over SILVER CREEK
Built 1975
DAUGHDRILL ROAD over BRANCH
Built 1997
US 84 over RELIEF
Built 2007
ROSE HILL ROAD over BRANCH OF SILVER CREEK
Built 1993
US 84 over HOOKER HOLLOW CREEK
Built 2008
US 84 over HOOKER HOLLOW CREEK
Built 1980
Bridge Details
- Structure #
- SA3900000000062
- Year Built
- 1984
- Reconstructed
- 2018
- Length
- 23.2 m (76.1 ft)
- Max Span
- 5.8 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.