CARMEL-NEW HOPE RD over MARSHALL CREEK

SEC 2 T 6N R10E B · County 077, Mississippi · Built 1990 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA3900000000029
Year Built
1990
Length
26.8 m (87.9 ft)
Max Span
9.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$57,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.