MOSLEY CROSSING RD over SUQUALENA CREEK

SEC 13 T 7N R14E · County 075, Mississippi · Built 2017 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA380000000A155
Year Built
2017
Length
37.9 m (124.3 ft)
Max Span
9.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$690,000
Total Project Cost
$840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.