SUNSHINE RD over BAKER CREEK

SEC 16 T 8N R16E B · County 075, Mississippi · Built 1993 · 2 Lanes · 520 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 5 Fair

Location

32.537081, -88.663675

This bridge is in worse condition than 79.8% of bridges in County 075. The average bridge in Mississippi is 0 years old; this one is 33 years old.

Nearby Bridges

Bridge Details

Structure #
SA3800000000273
Year Built
1993
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
520
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.