CAUSEYVILLE ROAD over BUCATUNNA CREEK

SEC 21 T 5N R17E B · County 075, Mississippi · Built 2000 · 2 Lanes · 750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA3800000000047
Year Built
2000
Length
73.1 m (239.8 ft)
Max Span
24.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,520,000
Total Project Cost
$1,670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.