CO.ROAD 311 over SPUR OF CLEAR CREEK

SEC 32 T 8S R 4W · County 071, Mississippi · Built 2001 · 2 Lanes · 70 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
SA3600000000070
Year Built
2001
Length
28.4 m (93.2 ft)
Max Span
9.5 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
70
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.