MANTOU STREET over RELIEF

SEC 13 T 8S R 6W · County 059, Mississippi · Built 2020 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA3000000000217
Year Built
2020
Length
9.4 m (30.8 ft)
Max Span
9.4 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.