RIVER RD over BAYOU-RELIEF

SEC 15 T 7S R 6W · County 059, Mississippi · Built 2004 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA3000000000104
Year Built
2004
Length
18.8 m (61.7 ft)
Max Span
9.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
5,000
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$700,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.