WACTOR ROAD over CAMERON CREEK

SEC 21 T 7N R 3E · County 037, Mississippi · Built 1969 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Failed
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed

Bridge Details

Structure #
SA1900000000109
Year Built
1969
Length
54.3 m (178.1 ft)
Max Span
5.8 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
50
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000,000
Total Project Cost
$5,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.