DAVIS ROAD over DRY PRONG CREEK

SEC 8 T 4N R12W · County 035, Mississippi · Built 2024 · 2 Lanes · 103 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA180000000A087
Year Built
2024
Length
37.8 m (124 ft)
Max Span
9.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
103
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.