PEPS POINT ROAD over PROVIDENCE CREEK

SEC 11 T 5N R14W B · County 035, Mississippi · Built 1973 · 2 Lanes · 1,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA1800000000209
Year Built
1973
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$255,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.