PUMPING STATION RD over BIG CREEK

SEC 15 T 1N R13W B · County 035, Mississippi · Built 1972 · 2 Lanes · 240 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
SA1800000000018
Year Built
1972
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.