SEMINRY-SUMRALL RD over BOWIE CREEK

SEC 12 T 6N R16W B · County 031, Mississippi · Built 1970 · 2 Lanes · 310 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
SA1600000000015
Year Built
1970
Length
128 m (419.9 ft)
Max Span
18.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
310
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.