COLONEL NEILL RD over TRIB OF PIERRE BAYOU

SEC 31 T 2N R 3W · County 029, Mississippi · Built 2012 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
SA1500000000207
Year Built
2012
Length
26.8 m (87.9 ft)
Max Span
9.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$38,000
Total Project Cost
$57,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.