FERGUSON ROAD over TRIB TO HOMOCHITTO RIVER
SEC 8 T 9N R 6E · County 029, Mississippi · Built 2002 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
31.759072, -90.632775
This bridge is in worse condition than 68.5% of bridges in County 029. The average bridge in Mississippi is 0 years old; this one is 24 years old.
Nearby Bridges
SR 28 over UNNAMED STREAM
Built 1950
FDR 130B over SLAYTON CREEK
Built 2011
SR 28 over BOBS BRANCH
Built 1950
MERCY SEAT ROAD over TRIB TO HOMOCHITTO RIVER
Built 2008
JOHN I HAY ROAD over HOMOCHITTO RIVER BCH
Built 2021
JOHN I HAY ROAD over SWEETWATER CREEK
Built 2019
SHELTON WEEKS RD over BRANDYWINE CREEK
Built 2004
HODGES ROAD over JACKSON CREEK
Built 2010
CASEYVILLE RD NW over DRY CREEK
Built 1977
MIDWAY RD over SWEETWATER
Built 2014
Bridge Details
- Structure #
- SA1500000000087
- Year Built
- 2002
- Length
- 17.4 m (57.1 ft)
- Max Span
- 5.8 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $114,000
- Total Project Cost
- $171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.