ST.PAUL ROAD over HOMOCHITTO RIVER

SEC 34 T 9N R 5E B · County 029, Mississippi · Built 1985 · 2 Lanes · 140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA1500000000086
Year Built
1985
Length
79.2 m (259.8 ft)
Max Span
30.5 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
140
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$520,000
Total Project Cost
$780,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.