FRIARS POINT over SUNFLOWER RIVER

SEC 14 T27N R 4W B · County 027, Mississippi · Built 1970 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
SA1400000000053
Year Built
1970
Length
46.3 m (151.9 ft)
Max Span
5.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
4,300
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$291,000
Total Project Cost
$358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.