T&P RT 3 over BAYOU PIERRE

SEC 51 T12N R 3E B · County 021, Mississippi · Built 2005 · 2 Lanes · 140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA1100000000056
Year Built
2005
Length
496 m (1627.3 ft)
Max Span
46 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
140
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,800,000
Total Project Cost
$5,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.