CR 215 over CHUQUATONCHEE CREEK

SEC 19 T13S R 5E · County 017, Mississippi · Built 1984 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
SA0900000000080
Year Built
1984
Length
28.3 m (92.8 ft)
Max Span
9.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$226,000
Total Project Cost
$279,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.