CO RD 81 over BCH OF MAGIC CREEK

SEC 26 T20N R 4E · County 015, Mississippi · Built 1973 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
SA0800000000147
Year Built
1973
Reconstructed
2023
Length
22 m (72.2 ft)
Max Span
5.3 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
20
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$235,000
Total Project Cost
$423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.