ACCESS ROAD over ENID EMERGENCY SPILLWAY

0.5MI E JCT I-55 & ACC RD · County 161, Mississippi · Built 2021 · 2 Lanes · 1,130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPMVKMS0000015
Year Built
2021
Length
54.9 m (180.1 ft)
Max Span
18.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,130
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.