E BANK ACCESS over YALOBUSHA RIVER GREN.OW

ACROSS OUTLET STR · County 043, Mississippi · Built 1953 · 1 Lanes · 1 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPLMKMS0000002
Year Built
1953
Length
16.1 m (52.8 ft)
Max Span
16.1 m
Width
4.2 m (13.8 ft)
Lanes
1
Daily Traffic
1
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$16,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.