SR 617 over CSX RR
0.3 MI S US 90 · County 059, Mississippi · Built 1972 · 6 Lanes · 20,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.369933, -88.5713
This bridge is in worse condition than 72.2% of bridges in County 059. The average bridge in Mississippi is 0 years old; this one is 54 years old.
Nearby Bridges
SR 617 over US 90
Built 1972
US 90 over EAST PASCAGOULA RIVER
Built 2003
SR 619 over PASCAGOULA BAY
Built 1989
MAGNOLIA STREET over BAYOU-RELIEF
Built 2006
SOUTH DESOTO ST over RELIEF
Built 2016
TUCKER AVENUE over UNNAMED RELIEF
Built 1960
PASCAGOULA STREET over BAYOU
Built 2007
INGALLS AVENUE over RELIEF
Built 1950
PASCAGOULA STREET over BAYOU
Built 2007
14TH ST over US 90
Built 1985
Bridge Details
- Structure #
- 860000003000090
- Year Built
- 1972
- Length
- 305.1 m (1001 ft)
- Max Span
- 23.5 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 6
- Daily Traffic
- 20,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.