SR 541 over BOWIE RIVER

4.7 MI S SIMPSON CL · County 065, Mississippi · Built 1966 · 2 Lanes · 370 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
310054103300620
Year Built
1966
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
370
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$492,000,000
Total Project Cost
$652,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.