SR 512 over UNNAMED CREEK

2.7 MI W SR 145 · County 023, Mississippi · Built 2020 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
310051201201610
Year Built
2020
Length
34.3 m (112.5 ft)
Max Span
33.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.