SR 348 over SAWMILL CREEK

11.2 MI E SR 15 · County 145, Mississippi · Built 1964 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
310034807301120
Year Built
1964
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
2,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$46,000,000
Total Project Cost
$204,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.