SR 315 over INDIAN CREEK

3.3 MI E QUITMAN CL · County 107, Mississippi · Built 2016 · 2 Lanes · 820 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
310031505401930
Year Built
2016
Length
61.4 m (201.4 ft)
Max Span
24.4 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
820
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.