SR 50 over CHUQUATONCHEE RELIEF

3.9 MI W US 45A · County 025, Mississippi · Built 1940 · 2 Lanes · 4,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
310005001306930
Year Built
1940
Length
91.4 m (299.9 ft)
Max Span
9.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.