SR 44 over BOGUE CHITTO RIVER

5.1 MI E US 51 · County 113, Mississippi · Built 1960 · 20 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
310004405700510
Year Built
1960
Length
103.6 m (339.9 ft)
Max Span
21.3 m
Width
8.8 m (28.9 ft)
Lanes
20
Daily Traffic
4,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000,000
Total Project Cost
$450,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.