SR 43 over HICKORY CREEK

3.1 MI E PEARL RIVER CL · County 045, Mississippi · Built 1963 · 2 Lanes · 3,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
310004302301830
Year Built
1963
Length
70.1 m (230 ft)
Max Span
21.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
3,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$214,000,000
Total Project Cost
$399,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.