SR 35 over N FORK TILLATOBA CR

0.2 MI N SR 32 EAST · County 135, Mississippi · Built 1956 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
310003506824810
Year Built
1956
Length
73.2 m (240.2 ft)
Max Span
24.4 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$340,000,000
Total Project Cost
$670,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.