SR 32 over RELIEF OPENING

7.1 MI E US 49E · County 135, Mississippi · Built 1949 · 2 Lanes · 880 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
310003206804560
Year Built
1949
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
880
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$209,000,000
Total Project Cost
$525,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.