SR 28 over CLEAR CREEK

0.5 MI W SR 35 · County 129, Mississippi · Built 1973 · 2 Lanes · 3,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
310002806510630
Year Built
1973
Length
54.9 m (180.1 ft)
Max Span
6.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
3,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.