SR 28 over PEARL RIVER RELIEF

1.3 MI E SR 27 · County 029, Mississippi · Built 1952 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
310002801506410
Year Built
1952
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
2,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$307,000,000
Total Project Cost
$915,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.