SR 26 over STREAM

3.0 MI W US 11 · County 109, Mississippi · Built 1949 · 2 Lanes · 3,100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
310002605501430
Year Built
1949
Length
12.8 m (42 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
3,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$81,000,000
Total Project Cost
$300,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.