SR 25 over PEARL RIVER RELIEF
1.6 MI N I 55 · County 049, Mississippi · Built 1965 · 3 Lanes · 21,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.331414, -90.128975
This bridge is in worse condition than 39.5% of bridges in County 049. The average bridge in Mississippi is 0 years old; this one is 61 years old.
Nearby Bridges
SR 25 over PEARL RIVER RELIEF
Built 1965
SR 25 over PEARL RIVER
Built 1965
SR 25 over PEARL RIVER
Built 1965
EASTOVER DR over LARGE STREAM
Built 2007
SR 468 over PRAIRIE BRANCH
Built 2015
LAKE CIR over SMALL STREAM
Built 2013
AZTEC DR over SMALL STREAM
Built 1986
SR 25 over EUBANKS CREEK
Built 1968
MANGUM DRIVE over DITCH
Built 1980
RIVERSIDE DRIVE over I 55
Built 1966
Bridge Details
- Structure #
- 31000250250016B
- Year Built
- 1965
- Reconstructed
- 2001
- Length
- 97.5 m (319.9 ft)
- Max Span
- 12.2 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 3
- Daily Traffic
- 21,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $127,000,000
- Total Project Cost
- $380,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.