SR 13 over STREAM

1.0 MI N FOREST CL · County 109, Mississippi · Built 1984 · 2 Lanes · 1,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

30.998344, -89.360722

This bridge is in worse condition than 91.7% of bridges in County 109. The average bridge in Mississippi is 0 years old; this one is 42 years old.

Nearby Bridges

Bridge Details

Structure #
310001305501080
Year Built
1984
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,400
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$62,000,000
Total Project Cost
$223,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.