SR 8 over CNIC RR

6.0 MI E LEFLORE CL · County 135, Mississippi · Built 1955 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

33.757711, -90.205911

This bridge is in worse condition than 60.9% of bridges in County 135. The average bridge in Mississippi is 0 years old; this one is 71 years old.

Nearby Bridges

Bridge Details

Structure #
310000806805000
Year Built
1955
Length
73.5 m (241.1 ft)
Max Span
24.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000,000
Total Project Cost
$314,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.