SR 7 over RELIEF OPENING

8.4 MI N YALOBUSHA CL · County 071, Mississippi · Built 1958 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
310000703611190
Year Built
1958
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
12,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$184,000,000
Total Project Cost
$252,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.