SR 6 over TULIP CREEK

2.7 MI S SR 178 · County 081, Mississippi · Built 1957 · 2 Lanes · 4,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
310000604112950
Year Built
1957
Length
67.3 m (220.8 ft)
Max Span
18.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
4,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$794,000,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.