SR 3 over CASSIDY BAYOU

1.4 MI N TALLAHATCHIE CL · County 119, Mississippi · Built 1949 · 2 Lanes · 880 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
310000306014270
Year Built
1949
Length
96 m (315 ft)
Max Span
19.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
880
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$418,000,000
Total Project Cost
$807,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.