SR 1 over BIG SUNFLOWER RIVER

10.6 MI N SR 322 · County 027, Mississippi · Built 1959 · 2 Lanes · 890 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
310000101414320
Year Built
1959
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
890
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000,000
Total Project Cost
$454,000,000