US 278 over TOMBIGBEE RIVER

3.5 MI W SR 25 SOUTH · County 095, Mississippi · Built 1996 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
210027804800430
Year Built
1996
Length
317.6 m (1042 ft)
Max Span
61 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
6,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.